One apartment done, five to go. We have tenants moving into the next apartment on November 1, and Kevin is working hard to get everything done in time. This apartment is on the top floor on the side of the building where the roof had collapsed, and very little of the original details could be salvaged. Instead, Kevin found floors that matched the original pine floors and trim with the same profile as the original trim. This photo shows the living room (and the original trim) as it looked when we bought the building.